redwood oak3
master craftsman
redwood oak3
fcountbefor

Click Photos to Enlarge

befored
oldcounterback
befored
openingfront
openingback
befored
openingdrywallf
during

Installed new framing and drywall to meet counter.

Adjusted ceiling grid to match.

openingback
befored
faceliftdrywall
during
halfcounter
facelifttiled
newcounterfin
during

Removed old tile and drywall on face of counter. Installed additional bracing and new drywall.

Installed and grouted new tile.

afterd

In the process of removing old counter.

Installed new corian countertop.

Installed panelling on new wall.

newcounterfinlow
afterd
newcounterinside
formicaandcounterreplacement
buffet bar before
befored
afterd
buffet bar after
afterd
befored
trash bin before
trash bin after
befored
before
afterd
after